Access and unloading
Confirm the delivery route, doors, lifting equipment, unloading area and safe path to the installation position.
Confirm access, foundation, power, water, air and drainage early so installation, commissioning and the first processing test can proceed smoothly.

Final dimensions, electrical load and connection requirements vary by model and configuration. Confirm the technical document for the exact machine before construction starts.
Confirm the delivery route, doors, lifting equipment, unloading area and safe path to the installation position.
Provide a solid, level, load-bearing foundation with working, maintenance and material-handling clearance.
Confirm the required voltage, frequency, phase, grounding and cable route for the selected equipment.
Prepare stable water supply, drainage and—where applicable—a settling or recycling arrangement for process water.
Confirm the available air supply, line route and required connection points for the machine configuration.
Arrange operators, tools, the agreed sample material and the people responsible for acceptance and training.

Before production begins, check the alignment, connections, lubrication, guards and emergency controls. Start with a no-load test, then process representative material under the agreed conditions.